AAMA Trading
Get a quotation ↗

PROCUREMENT GUIDE

Turn a material list into a clear enquiry.

A bill of materials helps a supplier understand what you need. A well-structured list reduces ambiguity and gives your quotation a stronger starting point.

Project plans and written specifications

THE SHORT ANSWER

What should a quotation BOM include?

Include one line per item, with a description, specification, quantity and unit. Add the preferred brand or model when relevant. State your destination and required timing, and make clear whether alternatives are acceptable.

A quotation BOM can be a spreadsheet, CSV or readable PDF. Keep the information consistent so the supplier can understand what each quantity refers to.

BUILD YOUR LIST

The details that make a difference.

01 / IDENTIFY

Name each item clearly

Use a product description that includes the type and application. Add a manufacturer or model reference if it is essential.

02 / SPECIFY

Capture technical details

Include dimensions, grades, ratings, finish or compatibility requirements. Link each supporting drawing to the correct item reference.

03 / QUANTIFY

Make quantities unambiguous

State whether the quantity is in pieces, metres, rolls, sheets or another unit. Avoid mixing units in a single line.

ILLUSTRATIVE FORMAT

A simple structure to follow.

The example below shows how to organise information. It is not a stock list, product recommendation or quotation.

FieldWhat to enter
Item referenceA unique line number or project reference.
DescriptionThe product or material required.
SpecificationSize, material, rating, model, finish or other essential details.
Quantity and unitThe amount required and what the amount measures.
AlternativesWhether equivalent brands or specifications may be proposed.
Required timingThe date or purchasing phase, and whether it is flexible.

BEFORE YOU SEND

Check the context, too.

Add your company and contact details, the destination country and city, and any order-level requirements. If a product must work with existing equipment, include the relevant system reference.

Check that totals, units and drawing references agree. Remove outdated versions so the supplier knows which list to review.

Let’s talk